Let's suppose one measures a 500 meter straight road. They take two measurement with a steel tape and use the temperature conversion factor. They find the two measurements are within the .08%. Next, using the shorter of the two measurements the distance is adjusted to the desired 500 meters. Lastly, the measure adjusts the course with a turning arc, so this course can be run with multiple laps to make the distance a 5k.
My question is should a SCPF be used?
Original Post