Skip to main content

DAG Timing System

RRTC has been contacted by DAG Timing Systems requesting RRTC approval of their timing system. RRTC has already approved several other systems. Information about the system may be found at:

Dag Timing System

Runners wear a bib number containing a sensing loop. The signal is received when they run through a rectangular loop of detecting wire.

The bib number is disposable.

What does anybody know about this system?
Original Post
×
×
×
×